Golf course improvements

Royal Blackheath Golf Club, London

Project summary

An ongoing programme of golf course renovation work

Following a competitive tender MJ Abbott Limited was awarded the contract to carry out Phase 1 of the course improvement master-plan at the historic Royal Blackheath Golf Club during the summer of 2015.

Working closely with golf course architect Ken Moodie of Creative Golf Design to a tight schedule, and despite a period of poor weather, the following works were completed:

  • Renovation of 6 holes
  • Partial reconstruction of the 16th green
  • Construction of new tee complexes on the 2nd and 17th holes
  • Construction, lining and sanding of 19 new bunkers
  • Ditch works, including 35m of new ditch connecting two existing ditches, re-grading and cleaning of existing ditches and a 26m long 300m diameter culvert across the 3rd fairway
  • Upgrading irrigation system within working areas to suit new features
  • Three large areas of hollows and mounding
  • Preparation and turfing or seeding of all working areas.

MJ Abbott subsequently completed a further two phases of works at the club.